Job Profile
Preparation of Design Basis report for Plumbing & FF System.
Water demand calculation for the project.
Design of domestic Cold / Hot water Supply system complete with fixture unit
calculation, Pipe Sizing & pressure drop calculations.
Design of drainage system / Sewage System.
Selection of WTP/STP .
Selecting the location for STP & Water Tanks.
Preparation of detailed main single line schematic.
Preparation of GA/sectional drawings for plumbing work.
Space planning for Plumbing Shaft for High rise buildings and Tunnel
Guidance of Preparation of building plan & equipment layout such as STP/WT etc.
Design Calculation for Storm water, rain water drainage system.
Selection & Calculation of Pump Capacity, Head requirement for the Pumps.
Detail drawing layout for internal & external water & Drainage System.
Preparation of BOQ , Selection of materials, Specification, Tender preparation etc.
Design of Fire fighting, Sprinkler System and fire suppression system as per NBC/
TAC/NFPA.
Detail drawing layout for internal & external Fire fighting, Sprinkler System and
fire suppression system.